NZAI-EN-LNG-105

Jetty Topside Design & Operations (Onshore, FSRU, FSU)

This program provides a comprehensive understanding of jetty topside systems and their operational integration across onshore, FSRU, and FSU LNG terminals. Learn how topside systems connect marine and process facilities, how safety and control layers synchronize with LNG carriers, and how design choices influence operability, maintenance, and marine safety.

Mode of Delivery:
2 Days Remote - Live

Secure your spot now — limited seats remaining!

Jetty Topside Systems
Ship–Shore Synchronization

Duration

2 Days

Full Remote (Live) or Face to Face in Thailand

Learn directly from practitioners — join live remote sessions or attend face-to-face programs in Thailand.

Advanced Level

Designed for professionals seeking deep, applied skills in Energy Transition, and LNG

Resources

Includes videos, diagrams, quizzes, and downloadable resources

Objective

This program provides a comprehensive understanding of jetty topside systems and their operational integration across onshore, FSRU, and FSU LNG terminals. Participants will learn how the topside systems connect the marine and process facilities, how safety and control systems synchronize with LNG carriers, and how design decisions directly influence operability, maintenance, and marine safety.

Curriculum Overview

  • Role of Jetty Topside Systems: interface between marine unloading and process facilities; functional hierarchy and design logic.
  • Topside Design: arrangement of loading arms, piping racks, ESD valves, and utility stations for different terminal types.
  • System Configuration Variations: comparing onshore terminal, FSRU, and FSU jetty topside.
  • Cryogenic Piping & Transfer Systems: material, flexibility, insulation, and cold-end design considerations.
  • Operational Sequencing: LNG unloading, cooldown coordination between jetty crew and carrier.
  • Case Studies: operational challenges and best practices from onshore, FSRU, and FSU jetty topsides.

What You Will Learn

By the end of this program, you will be able to:

  • Understand how jetty topside systems are designed and configured for different LNG terminal types.
  • Identify and evaluate critical safety, design, and operational interfaces between ship and shore.
  • Apply consultant-level thinking to review or optimize jetty topside configurations.

Program Delivery & Engagement

Delivered in 2 days (Remote Live), this program blends technical design discussions, operational case studies, and interactive problem-solving sessions.

Remote LiveCase StudiesInteractive

Practitioner Profile

Headshot of Mr. Rishi Agrawal

Mr. Rishi Agrawal

LNG ExpertFSRU / FSUImport TerminalsMarine Ops & Safety15+ Years

This course is delivered by an LNG Expert with 15+ years of experience in:

  • Designing and reviewing LNG import terminals, FSRUs, and FSUs.
  • Leading LNG import terminal projects for global clients (Asia, the Middle East, Europe).
  • Hands-on expertise in marine operations, topside safety, and LNG infrastructure planning.

Practitioners are recognized in the LNG industry, having advised on billion-dollar LNG-to-Power and regasification projects.

NetZeroX AI Courses | NetZeroX AI